BESSIndustry
Shaving power peaks
The challengeOccasional power spikes push up the contracted capacity and trigger overrun penalties.
- Container layout as close as possible to the point of delivery
- Connection to the site's main LV switchboard or MV substation
- Commissioning coordinated with the energy management system (EMS)
Expected benefitA lower contracted capacity and fewer overruns.