Grid-connected battery energy storage site

Use cases

What storage changes on your site.

Six typical configurations to help you picture your project: for each one, the starting need, our work and the expected benefit.

6 use cases

BESS

Industry

Shaving power peaks

The challengeOccasional power spikes push up the contracted capacity and trigger overrun penalties.

Our work
  • Container layout as close as possible to the point of delivery
  • Connection to the site's main LV switchboard or MV substation
  • Commissioning coordinated with the energy management system (EMS)

Expected benefitA lower contracted capacity and fewer overruns.

PV + BESS

Industry and commercial

Making the most of solar output

The challengeSolar generation peaks around midday, often out of step with the site's needs.

Our work
  • Analysis of generation and consumption profiles
  • Electrical interfaces between the PV plant and storage
  • Coordination of civil works, electrical works and testing

Expected benefitA higher self-consumption rate and less energy exported at low prices.

EV + BESS

Charge point operator

Fast charging on a constrained grid

The challengeThe power available at the connection point is not enough for several fast chargers, and a grid upgrade takes time.

Our work
  • Storage sizing based on charging profiles
  • Preparation of platforms, cable routes and networks
  • Coordination of chargers, storage and grid connection

Expected benefitHigh-power chargers in service without waiting for a grid upgrade.

BESS

Renewable producer

Providing grid services

The challengeA grid-connected storage park can monetise its flexibility: balancing reserves and market arbitrage.

Our work
  • Platform, foundations and access for dozens of containers
  • MV/LV substations and connection to the public grid
  • Acceptance testing and coordination with the network operator

Expected benefitA flexibility asset delivered on schedule, ready to operate under the chosen business model.

BESS

Commercial and critical sites

Securing power for critical processes

The challengeA power cut or micro-outage can stop production lines, servers or healthcare equipment.

Our work
  • Analysis of critical loads and outage scenarios
  • Integration with existing UPS systems and generators
  • Switchover tests and operating procedures

Expected benefitStronger service continuity and less reliance on diesel generators.

Microgrid

Local authority

Running a local microgrid

The challengeAn isolated or weakly connected site wants to combine local generation, storage and consumption in a single system.

Our work
  • Architecture of sources, loads and storage
  • Connection and coordination of equipment
  • Commissioning and test sequences

Expected benefitGreater energy autonomy and better use of local generation.

Your need isn't listed here?

Every site is different. Tell us about your situation and we will study the right configuration.