Battery energy storage site

Our core business

End-to-end BESS expertise.

Civil works, logistics, electrical engineering, commissioning and maintenance: every trade a storage site needs, brought together in a single team.

Describe my project

Our method

From groundworks to commissioning.

Each operation is defined according to the site, the equipment, the interfaces and the project phasing. Regulatory and safety requirements are assessed case by case.

  1. 01

    Prepare

    Civil works and utilities

    Site preparation, earthworks, foundations and underground networks to receive the equipment.

    Earthworks · Foundations · Utilities
  2. 02

    Deliver

    Transport and lifting

    Delivery, lifting and installation of battery containers, inverters and transformer substations.

    Transport · Lifting · Levelling
  3. 03

    Connect

    Electrical connection

    Cabling, MV/LV connection and grid interfaces, in line with the network operator's requirements.

    MV · LV · Main switchboard
  4. 04

    Test

    Commissioning and testing

    On-site testing, BMS and EMS checks, acceptance and support through to commercial operation.

    SAT · BMS · EMS
  5. 05

    Maintain

    Operations and maintenance

    Preventive and corrective maintenance, performance monitoring and on-site interventions.

    Preventive · Corrective · O&M

What we do

Five trades, one team.

Our services in detail, from site preparation to operation.

01

Civil works and site preparation

Slabs · Foundations · Utilities · ICPE

Create a platform ready to receive the equipment and the site operations, taking into account the constraints of the site and the project.

  • Heavy-vehicle access survey, earthworks and levelling
  • Slabs, foundations, pits and utility networks
  • Interfaces with applicable ICPE (French classified facilities) and fire safety requirements
02

Logistics, transport and handling

Convoy · Lifting · Positioning

Plan the delivery of the equipment to its final location, from site access through to lifting and levelling operations.

  • Survey of access points and route constraints
  • Coordination of oversized transport and crane operations
  • Handling, positioning and levelling of containers
03

Electrical engineering and MV/LV connection

Substations · Switchboards · Cabling · Grid

Build the system's electrical infrastructure and coordinate the interfaces between batteries, power conversion, auxiliaries and the grid.

  • MV/LV substations, transformers and power cabinets
  • Main LV switchboards, cabling, testing and connections
  • Coordination of interfaces with network operators, including Enedis or RTE depending on the project
04

Commissioning

BMS/EMS · Interfaces · SAT

Organise site commissioning together with integrators, equipment suppliers and project teams.

  • Pre-commissioning checks and start-up sequences
  • Coordination of BMS/EMS interfaces
  • Site acceptance tests (SAT) and punch-list follow-up
05

Operations and maintenance

Preventive · Corrective · On-call

Keep installations available under a contract tailored to the equipment, the operating conditions and the agreed commitments.

  • Preventive and corrective maintenance
  • Thermographic inspections and equipment monitoring
  • 24/7 on-call service depending on contract scope

Coordinated delivery

Interfaces prepared before the first lift.

Every project is framed around the schedule, site access, supplied equipment, responsibilities and expected tests. The scope of work and deliverables are adjusted to the contract and the site requirements.

Scope a BESS request

Let's define the right scope of work.

Tell us the target capacity, the project stage and the known site constraints.